Projects
Current Projects
We have a number of ongoing and long-term projects, including:
B&C Foods
April, 1995 – Present
We were charged with the design and implementation of a program to monitor processing plant discharge to the municipal sewer. Subsequently we were responsible for monitoring and collecting monthly samples and producing a written report submitted as a part of the client’s discharge permit.
VIHA
August, 2006 – Present
Development and implementation of monitoring program for discharge permit compliance. This contract was a continuation of the 2004 contract. Using data obtained in 2004, 2 sampling stations were set up around each hospital. The sampling points were designated in the discharge permit to be sampled quarterly for various organic and inorganic parameters. Both grab samples and 24 hour composite samples were taken at each station. One station at each site also had a flow meter installed and flow data was downloaded quarterly. The flow data, analysis results and field observations are all put in a final report that is submitted to the CRD as part of VIHA’s permit.
SNC Lavalin
2009 – Present
We are in charge of conducting a monthly freshwater sampling program for Navy ships.
Past Projects
VIHA
June – August, 2004
Determination of monitoring stations for sanitary sewer discharge permit compliance. Contract consisted of taking grab samples form various manholes around the South Island Hospitals and analyzing each sample for various organic and inorganic contaminants. The results were entered into an excel spread sheet and submitted to CRD. The results were then used to determine sampling points for Discharge Permit compliance for each of the hospitals. The contract also included training of VIHA staff carry out the program once the contract finished. Goode Environmental Services are called in as needed to help with the program.
Victoria Airport
August – September, 2005
Design and implementation of monitoring program to determine the source of contamination of Rhey Creek. The contract consisted of taking water (microbiological and chemical analysis), soil and vegetation samples from various stations along Rhey Creek from the head of the creek to the point were the creek runs into Bazan Bay. The stations were determined from historical data and proximity to storm basins and discharge outlets.
Knappett Construction
November – December, 2012
We conducted water testing and sampling during the construction of the McTavish Reservoir.
Strawberry Vale Community Center
June 2019
Asbestos Survey prior to starting renovations on the hall.
Client List
- Seaspan International
- Intercon Marine
- Chew Excavating
- Coastal Inspection Services
- McDonalds Canada
- Canadian Coast Guard
- Angus Consulting Management
- City of Victoria
- School District 63
- School District 61
- 1st Team Consulting
- Corporation of the District of Saanich
- B&C Foods
- SNC Lavalin
- Island Farms Dairy
- Empress Hotel
- Black and McDonald Ltd.
- Fisher Road Recycling
- Knappett Construction
- Kenetic Construction
- G4S Secure Solutions Canada
- VIHA
- VictoriaAirport